FBC2023R802.1.5.2
Other means during manufacture.
Original sourcePlain-English Explanation
Section R802.1.5.2 addresses other means during manufacture.. Verify specific requirements with the full code text and your local AHJ.
For the Contractor
Per R802.1.5.2 (Other means during manufacture.): verify compliance with local jurisdiction requirements.