IRC2018R301.2.2-TN
Seismic Design Requirements - New Madrid Zone (West Tennessee)
Original sourcePlain-English Explanation
Section R301.2.2-TN addresses seismic design requirements - new madrid zone (west tennessee). Verify specific requirements with the full code text and your local AHJ.
For the Contractor
Per R301.2.2-TN (Seismic Design Requirements - New Madrid Zone (West Tennessee)): verify compliance with local jurisdiction requirements.